MAPLE HOUSE | NEW BUILD
Project Description: Replacement dwelling in Ascot, Bershire
Total Gross Internal Area: Proposed 570m² (inc garage)
Planning Granted: August 2019
Project Type: Large New Build Dwelling Over 500m²
Procurement Method: Fully managed by Main Contractor.
Construction Technique: Mass concrete trench fill foundations with suspended concrete beam and block ground and first floor; Traditional load bearing masonry cavity wall with localised steel frame; Traditional cut timber pitched roof structure.
Tony Holt Design Appointment: Design and planning, full working drawings and assembly details. Ad-hoc support during construction phase.